Weider WESY19511 User Manual Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
9
11. During steps 11 through 24, refer to the CABLE
DIAGRAM on page 20 of this manual to verify
proper cable routing. Before beginning this sec-
tion, identify the Long Cable (23) and the Short
Cable (58) by comparing the lengths of the
cables.
IMPORTANT: While assembling the cables, do
not overtighten the bolts and nuts securing
the pulleys. The pulleys must be able to turn
freely.
12. Locate the Long Cable (23). Route the Long
Cable around the indicated 90mm Pulley (15)
attached to the Top Frame (55). Be sure that the
Cable is between the Pulley and the hook and
that the end of the Cable with the ball is on
the indicated side of the hook. Tighten the M10
x 90mm Bolt (77) and the M10 Nylon Locknut
(not shown).
13. Wrap the Long Cable (23) around a “V”-Pulley
(6). Attach the “V”-Pulley and a Long Cable Trap
(50) to the indicated bracket on the Front Upright
(42) with an M10 x 60mm Bolt (7) and an M10
Nylon Locknut (21). Be sure that the Long
Cable Trap is positioned to hold the Cable in
place.
14. Route the Long Cable (23) around the “V”-Pulley
(6) on the Left Arm (47). Be sure that the Cable
is in the groove of the Pulley and that the
Long Cable Trap (50) is positioned to hold the
Cable in place. Tighten the M10 x 60mm Bolt (7)
and the M10 Nylon Locknut (not shown).
14
11
12
13
58
23
55
77
Hook
Ball
15
50
23
7
47
23
7
21
6
50
23
6
42
Cable Assembly
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 27 28

Comments to this Manuals

No comments