CAUTIONRead all precautions and instruc-tions in this manual beforeusing this equipment. Save thismanual for future reference.Model No. WESY58630Seria
1019. Attach a Pulley Housing (94) to the indicated “U”-channel on the 10-pound Center Crossbow (44)with an M10 x 102mm Button Head Bolt (24), twoPivo
112380Rod2871761121. Attach a Pulley Housing (94) to the indicated “U”-channel on the 10-pound Center Crossbow (44)with an M10 x 102mm Button Head Bol
1227. Slide the four Foam Pads (26) onto the tubes onthe Front Leg (6) and the Leg Lever (7). Pressfour 19mm Round Inner Caps (78) into the endsof the
This section explains how to adjust the resistance system. See the EXERCISE GUIDELINES on page 17 forimportant information about how to get the most b
144980ATTACHING THE ACCESSORIESTo attach a Short Handle (49) to a high pulley, firstattach the high pulley to the resistance system (seeATTACHING THE
1530311Crossbows6734344“U”-Channel“U”-Channel801013STORING THE RESISTANCE SYSTEMTo store the resistance system, slide the ends of theLeg Lever Cable (
CABLE DIAGRAMThe cable diagram shows the proper routing of theLong Cable (80). Use the diagram to make sure thatthe Cable has been assembled correctly
17EXERCISE GUIDELINESTHE FOUR BASIC TYPES OF WORKOUTSMuscle BuildingTo increase the size and strength of your muscles,push them close to their maximum
Rest for a short period of time after each set. Theideal resting periods are:• Rest for three minutes after each set for a musclebuilding workout.• Re
19MONDAYDate:/ /EXERCISE RESISTANCE SETS REPSEXERCISE RESISTANCE SETS REPSEXERCISE RESISTANCE SETS REPSAEROBIC EXERCISEAEROBIC EXERCISETUESDAYDate:/ /
2WARNING DECAL PLACEMENTWARNING DECAL PLACEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
M10 Nylon Locknut (76)M8 Nylon Locknut (65)M6 Nylon Locknut (69)M8 Flange Nut (19)M8 Washer (59)M10 Lock Washer (103)38mm Round Inner Cap (38)50mm Squ
M10 x 103mm Bolt (66)M10 x 91mm Bolt (90)M10 x 108mm Bolt (81)M6 x 13mm Bolt (92)M4 x 16mm Screw (62)M4 x 19mm Screw (77)M4 x 12mm FlatHead Screw (85)
Note: “#” indicates a non-illustrated part. Specifications are subject to change without notice. See the back coverof the userʼs manual for informatio
697910093706559383410655938342171281481516217128546217176258586258536213989626248787328767628282928292271733076669954127682826560121945929265974646763
Part No. 196315 R0803A Printed in China © 2003 ICON Health & Fitness, Inc.To order replacement parts, simply call our Customer Service Department
31. Read all instructions in this manual beforeusing the resistance system. Use the resist-ance system only as described in this manual.2. It is the r
4CrossbarHigh PulleyLat TowerBackrestStorage KnobFulcrum KnobUprightLow PulleyBase PlateLeg LeverSeat KnobLat BarSeatFoot PlateCrossbows“U”-ChannelBEF
5Before beginning assembly, carefully read thefollowing information and instructions:• Assembly requires two persons.• Place all parts in a cleared ar
7562. Attach a Wheel (31) to the outside of the Base (1)with an M10 x 108mm Bolt (81), three M10Washers (75), and an M10 Nylon Locknut (76).Do not ove
78. Attach the Leg Lever Bumper (55) to the FrontLeg (6) with an M4 x 19mm Screw (77).Press two 45mm Square Inner Caps (42) into theLeg Lever (7).Lubr
89. Attach two 8mm Metal Spacers (97), a 60mmMetal Spacer (39), and two Bearing Wheels (46)to one end of the Seat Carriage (12) with an M8 x104mm Butt
914. Attach the two 10-pound Short Crossbow Caps(20) to the 10-pound Center Crossbow (44) withtwo M4 x 12mm Flat Head Screws (85).Using twelve M4 x 12
Comments to this Manuals